Fill Rate benchmark

Fill Rate Benchmark for MRO Distribution (2026)

Last updated July 2026

The short answer

In mro distribution, fill rate typically runs 90–97%. Critical-spare fill rates run higher by design. Fill rate is the percentage of demand met from stock on hand without backorder. It's the service metric excess-reduction efforts must protect.

Formula Fill Rate = Units Shipped from Stock ÷ Units Ordered

Fill Rate by industry (2026)

IndustryTypical Fill RateWhat good looks like
All industrial distribution 92–98% 95%+ is the common target for distribution
MRO Distribution 90–97% Critical-spare fill rates run higher by design
Industrial Distribution 93–98% Counter and project fill both matter
Electrical Distribution 94–99% Counter sales demand high availability
Utilities & Power 95–99%+ Critical spares target near-100% availability

Fill rate is the percentage of demand met from stock on hand without backorder. It's the service metric excess-reduction efforts must protect.

Where does yours land? If mro distribution operations want to move fill rate in the right direction, the fastest lever is usually the excess and obsolete tail — the SKUs holding cash without serving demand.

Sources: Planster / IHL

See what your inventory is really costing you.

Tell us where the cash is trapped — excess stock, idle surplus, slow RFQs — and we'll show you the outcome Maintained can unlock.